PILOT PLANNER

One station. A clear decision.

Work through the checks with your test engineer, operator, and sponsor. Set a review date before expanding to the line.

Build your business case

PILOT SETUP GUIDE

Set up the test.
Then test the fit.

A practical checklist for your first evaluation. Work through each stage with the people who will use and maintain the station.

A PCB held in a functional-test fixtureEXAMPLE / PCB FUNCTIONAL TEST

A scope everyone can agree on.

TEST ENGINEER + SPONSOR

Scope the bench.

Choose a representative procedure, name its owner, and record how much effort the current workflow takes.

Stage 1 checklist
Set your baseline
0 / 12 CHECKS COMPLETE

Your checklist stays in this page session. Adjust the scope and acceptance criteria to your hardware; checking a box does not validate the station.

TECHNICAL WORKING SESSION

Bring one test. Plan the next step.

Work through your setup with a test engineer. Start with a procedure and a small sample of results; together, we’ll define a practical first station.

What to bring

Your test code or report format, a few passing and failing results, and the station you want to connect. Add hosting or access requirements if they matter to the pilot.

What we review

How results reach tofupilot, which unit and measurement context to record, and the steps from an unexpected result to the engineer who investigates it.

What we plan together

An integration path, a first procedure and station, an owner, and a short list of checks to judge the pilot. Record open questions before expanding.

Put your first station to the test.