TEST ANALYTICS
Find the signal in your test data.
See the variation behind a pass. Follow yield, explore measurements, and trace a change to its source.
Reference voltage
Readings96
Mean3.3103 V
Cpk0.72
Specification3.25–3.35 V
Inspect the latest runs
RUN 0963.3408 VPASS
See the shift. Read measurements over time.
Check the spread. Inspect the distribution and Cpk.
Follow the evidence. Select a reading to inspect its run.
PRODUCTION AT A GLANCE
Your line, in one view.
Yield, test volume and duration. See what changed and where to look next.
Illustrative data
First-pass yield94.2%
Test runs2,495
Average duration24.8s
Day 1
PassedFailed
Day 28Reference voltageInspect the measurements
FROM OVERVIEW TO DETAIL
Focus on what changed.
Narrow by station, batch or revision. Keep the context as you follow the data.
Reference voltage8 runs in view
Same measurements. A more focused view.
Illustrative data